Abdullah, N., & Othman, N. (2023). Applying the Fuzzy Delphi Method to the Content Validity of the Female Leadership Personality Instrument. Thailand Statistician, 21(2), 337–350.file:///C:/Users/acer/Downloads/No.8_THATSTAT-D-21-00018-Final.pdf
Akbar, M. A., Khan, A. A., Mahmood, S., & Hyrynsalmi, S. (2025). Management of DevSecOps Process: An Empirical Investigation. Software: Practice and Experience. https://doi.org/10.1002/spe.3095
Alaei,M , Safdari Ranjbar,M and Faham,E . (2025). The Transition to Industry 4.0 from a Sustainable Development Perspective: A Meta-Synthesis of Opportunities, Challenges, and Policy Requirements. Journal of Technology Development Management, 13(1), 81-116. doi: 10.22104/jtdm.2026.7637.3415[In Persian]
Amaro, F., & Domingues, L. (2023). PMBOK 6th meets 7th: How to link both guides in order to support project tailoring? Procedia Computer Science, 219, 1877–1884. https://doi.org/10.1016/j.procs.2023.01.486
Bialkova, S. (2024). AI connecting business and consumers. In The rise of AI user applications: Chatbots integration foundations and trends (pp. 129–142). Springer Nature Switzerland. https://doi.org/10.1007/978-3-031-56471-0_8
CATANA, A. E., & FLORESCU, A. (2025). PMBOK Standards–A Structured Literature Review. Contexts, 1(4), 5.
Chen, T., Zhang, J., & Lai, K. K. (2009). An integrated real options evaluating model for information technology projects under multiple risks. International Journal of Project Management, 27(8), 776–786. DOI:10.1016/j.ijproman.2009.01.001
Dong, H., Dacre, N., Baxter, D., & Ceylan, S. (2024). What is agile project management? Developing a new definition following a systematic literature review. Project Management Journal, 55(6), 668–688. https://doi.org/10.1177/87569728241231244
Frankel, K. K., Brooks, M. D., & Learned, J. E. (2025). Teachers' perspectives on the structure of reading intervention classes in secondary schools: A meta-synthesis of qualitative research. Teaching and Teacher Education, 162, 105029. https://doi.org/10.1177/01614681211048624
Guo, S., & Zhao, H. (2017). Fuzzy best-worst multi-criteria decision-making method and its applications. Knowledge-Based Systems, 121, 23–31.
Hamadaqa, M. H. M., Alnajjar, M., Ayyad, M. N., Al-Nakhal, M. A., Abunasser, B. S., & Abu-Naser, S. S. (2024). Leveraging artificial intelligence for strategic business decision-making: Opportunities and challenges. https://philpapers.org/rec/HAMLAI
Horváth, V. (2019). Project management competence–Definitions, models, standards and practical implications. Vezetéstudomány – Budapest Management Review, 50(11), 2–17. https://doi.org/10.14267/VEZTUD.2019.11.01
Li, X., Mathur, G., & Jugdev, K. (2025). Impact of using project management tools and techniques on project and firm performance. International Journal of Managing Projects in Business, 18(2), 312–330. https://doi.org/10.1108/IJMPB-10-2023-0284
Mazroui Nasrabadi,E and Habibirad,A . (2023). Presenting the industry 4.0 driver model in healthcare: a mixed method. Journal of Technology Development Management, 11(1), 85-115. doi: 10.22104/jtdm.2024.6559.3237 [In Persian]
Mirchi, S., Vedadi, A., & Gholamzadeh, D. (2024). Applying a meta-synthesis approach to present a blended learning model for talent development. J Med Educ, 22(1). https://doi.org/10.5812/jme-142760
Mohammadi, F., Nabi Bidhendi, G., & Aslani, A. (2023). Designing an energy security index with a sustainable development approach for energy-exporting countries using fuzzy BWM method. Environmental Science and Pollution Research, 30(3), 7427–7445. DOI: 10.1007/s11356-022-22631-7
Mohammadi,M , Heidaryd Dahooie,J and Ahmadi,A . (2024). Identification and prioritization of artificial intelligence applications in supply chain 4.0 (retail industry case study). Journal of Technology Development Management, 11(4), 78-106. doi: 10.22104/jtdm.2024.6904.3317[In Persian]
Müller, R., Locatelli, G., Holzmann, V., Nilsson, M., & Sagay, T. (2024). Artificial intelligence and project management: Empirical overview, state of the art, and guidelines for future research. Project Management Journal, 55(1), 9–15. https://doi.org/10.1177/87569728231225198
Rezaei, J. (2015). Best-worst multi-criteria decision-making method. Omega, 53, 49–57. 10.1016/j.omega.2014.11.009
Safari, E. and Ebrahimi, K. (2022). Prioritizing application areas to deploy artificial intelligence technology using thematic analysis and COPRAS. Research in Production and Operations Management, 13(4), 91-110. doi: 10.22108/pom.2023.134630.1457
Seif, E. (2025). Application project management in establishing supply chain. International Journal of Industrial Engineering and Operational Research, 7(2), 1–10. https://doi.org/10.1504/IJIEOR.2025.10033116
Shamim, M. M. I. (2024). Artificial intelligence in project management: Enhancing efficiency and decision-making. International Journal of Management Information Systems and Data Science, 1(1), 1–6. https://doi.org/10.62304/ijmisds.v1i1.107
Taboada, I., Daneshpajouh, A., Toledo, N., & de Vass, T. (2023). Artificial intelligence enabled project management: A systematic literature review. Applied Sciences, 13(8), 5014. https://doi.org/10.3390/app13085014
Zadeh, E. K., Khoulenjani, A. B., & Safaei, M. (2024). Integrating AI for agile project management: Innovations, challenges, and benefits. International Journal of Industrial Engineering and Construction Management (IJIECM), 1(1), 1–10. https://www.ijiecm.com/index.php/ijiecm/article/view/1
Zambrano, L., Atencio, E., Mariani, C., Mancini, M., & Atencio, E. (2024). Integration between PMBOK 7th concepts: A network analysis. In Proceedings of the 14th International Conference on Industrial Engineering and Operations Management (pp. 1098–1108). https://doi.org/10.46254/AN14.20240277