Journal of Technology Development Management

Journal of Technology Development Management

Identification and Analysis of Artificial Intelligence Applications in Project Management (Case Study: Information Technology Projects)

Document Type : Research Paper

Authors
1 Department of Management, Faculty of Economic and Administrative Sciences, Qom University, Qom, Iran
2 Department of Management, Faculty of Economic and Administrative Sciences, University of Qom, Qom, Iran
Abstract
Introduction and Objectives: In recent decades, the increasing spread of new technologies, including artificial intelligence, has led to fundamental changes in various organizational and management fields. One of the prominent fields that has been increasingly affected by artificial intelligence is information technology project management. The present study aims to identify and prioritize the applications of artificial intelligence in information technology project management.
Methods: This study attempts to extract the most important areas of AI application in this field, as well as evaluate and classify their importance and feasibility from the perspective of experts. To achieve this goal, a mixed approach was used. In the first stage, theoretical information was extracted from reliable scientific sources using the meta-synthesis method and the main applications of artificial intelligence in project management were identified. Next, to analyze and prioritize these applications, the fuzzy Delphi technique was used to screen the applications and the Mabak method was used to prioritize them. The research philosophy was pragmatic (a combination of interpretive and positivistic approaches), applied orientation, exploratory goal, mixed research logic, and the data collection method was field. The theoretical community included managers,
Keywords
Subjects

Abdullah, N., & Othman, N. (2023). Applying the Fuzzy Delphi Method to the Content Validity of the Female Leadership Personality Instrument. Thailand Statistician, 21(2), 337–350.file:///C:/Users/acer/Downloads/No.8_THATSTAT-D-21-00018-Final.pdf
Akbar, M. A., Khan, A. A., Mahmood, S., & Hyrynsalmi, S. (2025). Management of DevSecOps Process: An Empirical Investigation. Software: Practice and Experience. https://doi.org/10.1002/spe.3095
Alaei,M , Safdari Ranjbar,M and Faham,E . (2025). The Transition to Industry 4.0 from a Sustainable Development Perspective: A Meta-Synthesis of Opportunities, Challenges, and Policy Requirements. Journal of Technology Development Management, 13(1), 81-116. doi: 10.22104/jtdm.2026.7637.3415[In Persian]
Amaro, F., & Domingues, L. (2023). PMBOK 6th meets 7th: How to link both guides in order to support project tailoring? Procedia Computer Science, 219, 1877–1884. https://doi.org/10.1016/j.procs.2023.01.486
Bialkova, S. (2024). AI connecting business and consumers. In The rise of AI user applications: Chatbots integration foundations and trends (pp. 129–142). Springer Nature Switzerland. https://doi.org/10.1007/978-3-031-56471-0_8
CATANA, A. E., & FLORESCU, A. (2025). PMBOK Standards–A Structured Literature Review. Contexts, 1(4), 5.
Chen, T., Zhang, J., & Lai, K. K. (2009). An integrated real options evaluating model for information technology projects under multiple risks. International Journal of Project Management, 27(8), 776–786. DOI:10.1016/j.ijproman.2009.01.001
Dong, H., Dacre, N., Baxter, D., & Ceylan, S. (2024). What is agile project management? Developing a new definition following a systematic literature review. Project Management Journal, 55(6), 668–688. https://doi.org/10.1177/87569728241231244
Frankel, K. K., Brooks, M. D., & Learned, J. E. (2025). Teachers' perspectives on the structure of reading intervention classes in secondary schools: A meta-synthesis of qualitative research. Teaching and Teacher Education, 162, 105029. https://doi.org/10.1177/01614681211048624
Guo, S., & Zhao, H. (2017). Fuzzy best-worst multi-criteria decision-making method and its applications. Knowledge-Based Systems, 121, 23–31.
Hamadaqa, M. H. M., Alnajjar, M., Ayyad, M. N., Al-Nakhal, M. A., Abunasser, B. S., & Abu-Naser, S. S. (2024). Leveraging artificial intelligence for strategic business decision-making: Opportunities and challenges. https://philpapers.org/rec/HAMLAI
Horváth, V. (2019). Project management competence–Definitions, models, standards and practical implications. Vezetéstudomány – Budapest Management Review, 50(11), 2–17. https://doi.org/10.14267/VEZTUD.2019.11.01
Li, X., Mathur, G., & Jugdev, K. (2025). Impact of using project management tools and techniques on project and firm performance. International Journal of Managing Projects in Business, 18(2), 312–330. https://doi.org/10.1108/IJMPB-10-2023-0284
Mazroui Nasrabadi,E and Habibirad,A . (2023). Presenting the industry 4.0 driver model in healthcare: a mixed method. Journal of Technology Development Management, 11(1), 85-115. doi: 10.22104/jtdm.2024.6559.3237 [In Persian]
Mirchi, S., Vedadi, A., & Gholamzadeh, D. (2024). Applying a meta-synthesis approach to present a blended learning model for talent development. J Med Educ, 22(1). https://doi.org/10.5812/jme-142760
Mohammadi, F., Nabi Bidhendi, G., & Aslani, A. (2023). Designing an energy security index with a sustainable development approach for energy-exporting countries using fuzzy BWM method. Environmental Science and Pollution Research, 30(3), 7427–7445. DOI: 10.1007/s11356-022-22631-7
Mohammadi,M , Heidaryd Dahooie,J and Ahmadi,A . (2024). Identification and prioritization of artificial intelligence applications in supply chain 4.0 (retail industry case study). Journal of Technology Development Management, 11(4), 78-106. doi: 10.22104/jtdm.2024.6904.3317[In Persian]
Müller, R., Locatelli, G., Holzmann, V., Nilsson, M., & Sagay, T. (2024). Artificial intelligence and project management: Empirical overview, state of the art, and guidelines for future research. Project Management Journal, 55(1), 9–15. https://doi.org/10.1177/87569728231225198
Rezaei, J. (2015). Best-worst multi-criteria decision-making method. Omega, 53, 49–57. 10.1016/j.omega.2014.11.009
Safari, E. and Ebrahimi, K. (2022). Prioritizing application areas to deploy artificial intelligence technology using thematic analysis and COPRAS. Research in Production and Operations Management, 13(4), 91-110. doi: 10.22108/pom.2023.134630.1457
Seif, E. (2025). Application project management in establishing supply chain. International Journal of Industrial Engineering and Operational Research, 7(2), 1–10. https://doi.org/10.1504/IJIEOR.2025.10033116
Shamim, M. M. I. (2024). Artificial intelligence in project management: Enhancing efficiency and decision-making. International Journal of Management Information Systems and Data Science, 1(1), 1–6. https://doi.org/10.62304/ijmisds.v1i1.107
Taboada, I., Daneshpajouh, A., Toledo, N., & de Vass, T. (2023). Artificial intelligence enabled project management: A systematic literature review. Applied Sciences, 13(8), 5014. https://doi.org/10.3390/app13085014
Zadeh, E. K., Khoulenjani, A. B., & Safaei, M. (2024). Integrating AI for agile project management: Innovations, challenges, and benefits. International Journal of Industrial Engineering and Construction Management (IJIECM), 1(1), 1–10. https://www.ijiecm.com/index.php/ijiecm/article/view/1
Zambrano, L., Atencio, E., Mariani, C., Mancini, M., & Atencio, E. (2024). Integration between PMBOK 7th concepts: A network analysis. In Proceedings of the 14th International Conference on Industrial Engineering and Operations Management (pp. 1098–1108). https://doi.org/10.46254/AN14.20240277

  • Receive Date 21 November 2025
  • Revise Date 04 August 2026
  • Accept Date 05 August 2026